Transcript of Public Hearing Reconstruction of Route 72 Town of Bristol from the Vicinity of the Memorial Boulevard-Riverside Avenue (Route 72) Intersection Easterly to about 800 Feet East of the King St. (Route 229) Intersection and Includes a Section of Route 229 (Middle Street and King St.) from Pine St. Northerly to about 200 Feet North of 1st Street, March 9, 1967
Author | : Connecticut. State Highway Department |
Publisher | : |
Total Pages | : 0 |
Release | : 1967 |
ISBN-10 | : OCLC:1379067233 |
ISBN-13 | : |
Rating | : 4/5 ( Downloads) |
Download or read book Transcript of Public Hearing Reconstruction of Route 72 Town of Bristol from the Vicinity of the Memorial Boulevard-Riverside Avenue (Route 72) Intersection Easterly to about 800 Feet East of the King St. (Route 229) Intersection and Includes a Section of Route 229 (Middle Street and King St.) from Pine St. Northerly to about 200 Feet North of 1st Street, March 9, 1967 written by Connecticut. State Highway Department and published by . This book was released on 1967 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: