Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Author :
Publisher :
Total Pages : 68
Release :
ISBN-10 : OCLC:227916566
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland by :

Download or read book Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland written by and published by . This book was released on 1995 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this investigation is to conduct a remedial investigation/feasibility study at the HHA and FTA sites at Fort Meade. As part of the analyses, data gaps will be identified. Previous studies have been conducted by Arthur D. Little, Inc., and EA engineering, Science and Technology, Inc. The RI/FS process is designed to collect sufficient data of demonstrable quality, which can then be used to assess potential risks to human health and the environment, develop/evaluate remedial alternatives, and select a preferred remedial action. In general, data obtained during the RI phase is used to evaluate the nature, extent, and migration of contaminants at sites that are known or believed to have been adversely impacted by past hazardous waste or hazardous materials handling practices. The FS phase evaluates potential remedial action with regard to effectiveness, risk reduction or mitigation, implementability, and cost.


Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland Related Books

Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Language: en
Pages: 68
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

The purpose of this investigation is to conduct a remedial investigation/feasibility study at the HHA and FTA sites at Fort Meade. As part of the analyses, data
Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Language: en
Pages: 70
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

This Work Plan has been prepared to address the Remedial Investigation/ Feasibility Study (RI/FS) activities being conducted at the Helicopter Hangar Area (HHA)
Final Quality Assurance Plan for the Remedial Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Language: en
Pages: 73
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

The Quality Assurance (QA) reviews under this task order for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Ag
Site Health and Safety Plan for the Helicopter Hangar Area, Fire Training Area, and Ordnance Demolition Area at Fort George G. Meade, Maryland
Language: en
Pages: 66
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

The U.S. Army Environmental Center (USAEC) policy is to provide a safe and healthfiil workplace for all employees and subcontractors. The accomplishment of this
Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2
Language: en
Pages: 189
Authors:
Categories:
Type: BOOK - Published: 1993 - Publisher:

DOWNLOAD EBOOK

This Quality Control Plan has been prepared to address the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) Addendum activities and a C