Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J.

Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J.
Author :
Publisher :
Total Pages : 142
Release :
ISBN-10 : OCLC:871363788
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J. by :

Download or read book Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J. written by and published by . This book was released on 1995 with total page 142 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Quality Assurance/Quality Control (QA/QC) Program for Phase 2 of the Clinch River Remedial Investigation (CRRI) was designed to comply with both Department of Energy (DOE) Order 5700.6C and Environmental Protection Agency (EPA) QAMS-005/80 (EPA 1980a) guidelines. QA requirements and the general QA objectives for Phase 2 data were defined in the Phase 2 Sampling and Analysis Plan (SAP)-Quality Assurance Project Plan, and scope changes noted in the Phase 2 Sampling and Analysis Plan Addendum. The QA objectives for Phase 2 data were the following: (1) Scientific data generated will withstand scientific and legal scrutiny. (2) Data will be gathered using appropriate procedures for sample collection, sample handling and security, chain of custody (COC), laboratory analyses, and data reporting. (3) Data will be of known precision and accuracy. (4) Data will meet data quality objectives (DQOs) defined in the Phase 2 SAP.


Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J. Related Books

Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J.
Language: en
Pages: 142
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

The Quality Assurance/Quality Control (QA/QC) Program for Phase 2 of the Clinch River Remedial Investigation (CRRI) was designed to comply with both Department
Remedial Investigation/feasibility Study of the Clinch River/Poplar Creek Operable Unit
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2001 - Publisher:

DOWNLOAD EBOOK

This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more t
Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, D.
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 2001 - Publisher:

DOWNLOAD EBOOK

This document contains appendices A (water characterization), B (sediment characterization), C (biota Characterization), D (applicable or relevant and appropria
Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 4. Appendix F.
Language: en
Pages: 513
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crac