Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri
Author :
Publisher :
Total Pages : 62
Release :
ISBN-10 : OCLC:68438095
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri by :

Download or read book Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri written by and published by . This book was released on 1999 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.


Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri Related Books

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri
Language: en
Pages: 62
Authors:
Categories:
Type: BOOK - Published: 1999 - Publisher:

DOWNLOAD EBOOK

This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The s
Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri
Language: en
Pages: 34
Authors:
Categories:
Type: BOOK - Published: 2003 - Publisher:

DOWNLOAD EBOOK

This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring s
Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri
Language: en
Pages: 0
Authors: United States. Department of Energy. Weldon Spring Site Remedial Action Project
Categories: Hazardous waste site remediation
Type: BOOK - Published: 1999 - Publisher:

DOWNLOAD EBOOK

Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri
Language: en
Pages: 0
Authors: United States. Department of Energy. Weldon Spring Site Remedial Action Project
Categories: Hazardous waste site remediation
Type: BOOK - Published: 2003 - Publisher:

DOWNLOAD EBOOK

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri
Language: en
Pages: 104
Authors:
Categories:
Type: BOOK - Published: 2003 - Publisher:

DOWNLOAD EBOOK

This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DO