DOE/EA-1493

DOE/EA-1493
Author :
Publisher :
Total Pages : 5
Release :
ISBN-10 : OCLC:316484566
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis DOE/EA-1493 by :

Download or read book DOE/EA-1493 written by and published by . This book was released on 2004 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: DOE has prepared an Environmental Assessment (EA), DOE/EA-1493, titled ''Greenidge Multi-Pollutant Control Project'', to analyze the potential environmental consequences of providing cost-shared funding support for the design, construction, and demonstration of an integrated multipollutant control system at AES's Greenidge Station in Dresden, New York. The system, expected to control emissions of NO{sub x}, SO{sub 2}, SO{sub 3}, HF, HCl, and Hg, would be installed on the existing, coal-fired, 107-MW Unit 4 at Greenidge. The results of the analyses provided in the EA are summarized in this Finding of No Significant Impact. The proposed action is for DOE to provide about $14.5 million for this project, while CONSOL Energy Inc. and its project partners would be responsible for the remaining $21 million. The proposed project will result in technical, environmental, and financial data from the design, operation and construction of the multi-pollutant control system. This 4.5-year, commercial-scale demonstration project would allow utilities, particularly those with units less than 300-MW in capacity, to make decisions regarding the integrated multi-pollutant control system as a viable commercial option. Based on the analyses in the EA, DOE has concluded that the Greenidge Multi-Pollutant Control Project would result in minimal and insignificant consequences to the human environment. Thus, DOE considers that the proposed action, providing cost-shared funding for the project, is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 United States Code 4321, et seq. Therefore, in accordance with 10 CFR Part 1021.322, DOE has concluded that preparation of an Environmental Impact Statement is not required, and DOE is issuing this FONSI.


DOE/EA-1493 Related Books

DOE/EA-1493
Language: en
Pages: 5
Authors:
Categories:
Type: BOOK - Published: 2004 - Publisher:

DOWNLOAD EBOOK

DOE has prepared an Environmental Assessment (EA), DOE/EA-1493, titled ''Greenidge Multi-Pollutant Control Project'', to analyze the potential environmental con
Energy Research Abstracts
Language: en
Pages: 884
Authors:
Categories: Power resources
Type: BOOK - Published: 1993 - Publisher:

DOWNLOAD EBOOK

Energy Abstracts for Policy Analysis
Language: en
Pages: 732
Authors:
Categories: Power resources
Type: BOOK - Published: 1987 - Publisher:

DOWNLOAD EBOOK

Environmental Pollution & Control
Language: en
Pages: 834
Authors:
Categories: Pollution
Type: BOOK - Published: 1980 - Publisher:

DOWNLOAD EBOOK

Mendocino National Forest (N.F.), Geothermal Leasing Recommendation, Environmental Assessment (EA).
Language: en
Pages: 230