Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1

Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1
Author :
Publisher :
Total Pages : 0
Release :
ISBN-10 : OCLC:45522252
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1 by :

Download or read book Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1 written by and published by . This book was released on 1995 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Overall Quality Assurance Project Plan (OQAPP) has been prepared as a component of Delivery Order No. 2 of Contract DAAA15-90-D-0017. The purpose of this OQAPP is to define responsibilities and authorities, and to prescribe requirements for assuring that the remedial investigation (RI) and feasibility study (FS) for Fort Sheridan are planned and executed in a manner consistent with U.S. Army Environmental Center (USAEC), U.S. Environmental Protection Agency (EPA) Region V, and Illinois Environmental Protection Agency (IEPA) quality assurance (QA) objectives. This OQAPP provides guidance and specifications to ensure that: (1) Field determinations and laboratory analytical results are of known quality and are valid, consistent, and compatible with the USAEC chemical database through the use of approved methods, preventive maintenance procedures, calibration and analytical protocols, quality control (QC) measurements, reviews, and audits. (2) Samples are obtained using appropriate, documented procedures; identified uniquely; and controlled through sample tracking systems and chain-of-custody procedures. (3) Records are retained as documentary evidence of the quality of samples, applied processes, equipment, and results.(4) Generated data are validated. (5) Calculations and evaluations are accurate, appropriate, and consistent throughout the project.


Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1 Related Books

Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1
Language: en
Pages: 0
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

This Overall Quality Assurance Project Plan (OQAPP) has been prepared as a component of Delivery Order No. 2 of Contract DAAA15-90-D-0017. The purpose of this O
Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study, Fort Sheridan, Illinois
Language: en
Pages: 908
Authors: Environmental science and engineering inc gainesville fl
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

This ESE standard operating procedure follows EPA SW-846 protocols with additional quality control requirements applicable for the Class lM analysis under the U
Quality Assurance Project Plan Remedial Investigation/Feasibility Study (RI/FS) Sampling Activities
Language: en
Pages: 0
Authors:
Categories: Atwood Park (New Milford, Ill.)
Type: BOOK - Published: 2009 - Publisher:

DOWNLOAD EBOOK

Remedial Investigation/Baseline Risk Assessment for the Ravines and Beach Area Study Areas of the Surplus Operable Unit, Fort Sheridan, Illinois, Volume 2 - RI Appendices J-Q.
Language: en
Pages: 695
Authors: Qst environmental inc st louis mo
Categories:
Type: BOOK - Published: 1998 - Publisher:

DOWNLOAD EBOOK

Fort Sheridan performed validation of analytical data that were collected during the Phase I Remedial investigation (RI) in 1990 to 1991. As required by the Fin
Quality Assurance Project Plan (QAPP) for Remedial Investigation/feasibility Study Work Plan
Language: en
Pages:
Authors: Benchmark Environmental Engineering & Science
Categories: Brownfields
Type: BOOK - Published: 2006 - Publisher:

DOWNLOAD EBOOK